Shed Base Estimator
Calculate concrete and ground preparation materials for a shed base or slab.
Shed base materials for a 2m by 1.8m base
For a shed base measuring 2 metres by 1.8 metres, this estimate includes concrete, hardcore and damp proof membrane allowance using the default build-up shown below.
- Base area3.60 m²
- Concrete0.40 m³
- Hardcore0.79 tonnes
- DPM allowance3.96 m²
Results - Shed Base Estimator
- Base area3.60 m²
- Concrete0.40 m³
- Hardcore0.79 tonnes
- DPM allowance3.96 m²
How this shed base estimator works
It calculates the slab area, concrete volume, sub-base volume and a practical DPM allowance for common shed and outbuilding bases.
Popular sizes
Popular pre-filled calculator pages.
Pre-filled calculator pages help visitors jump straight to a useful estimate and then refine the result if needed.